Initial Production Check (IPC)

The cheapest defect to fix is the one found in the first ten units. An initial production check puts a TRAIBCERT inspector in the factory as the line starts, to verify that the materials, components, tooling and first-off units match what you approved before thousands more are made the same way.

Overview

What Initial Production Check (IPC) is

An initial production check is carried out when raw materials and components have been received and the first units are coming off the line, typically at 0 to 10% of the order. The inspector confirms that the materials and components are those specified (grade, supplier, certificates), that the production line, tooling and moulds are set up as approved, that the first units match the golden sample, and that the factory has the capacity and schedule to deliver on time.

Where a pre-shipment inspection tells you what has been made, an initial production check changes what will be made. It is the point at which a wrong fabric batch, an unapproved component substitution or a mis-set mould is caught for the cost of a day.

When to use it

Is this inspection right for your order?

  • A new supplier, new product or new tooling.
  • Orders with long production runs where a systemic error would be expensive to rework.
  • Material-critical products: specified fabrics, food-contact plastics, alloys and electrical components.
  • Tight delivery windows where a late discovery cannot be recovered.

Inspection checklist

What the inspector checks

  • Raw materials and components: identity, grade and quantity received against the bill of materials, with supplier certificates and test reports on file.
  • Approved sample: first-off units compared with the golden sample and specification, dimension by dimension.
  • Tooling and set-up: moulds, dies, jigs and line settings as approved; changes recorded.
  • Factory readiness: capacity, staffing and schedule against the delivery date; in-process quality control points in place.
  • Packaging materials: retail packaging, labels and cartons received and correct before they are needed.

Deliverables

What you receive

A same-day flash report on whether production may proceed, with material and first-off findings photographed; the full report follows within two working days and includes a schedule risk statement, so purchasing can act while the run is still at the start.

Inspection process

Enquiry → scope and quotation (one working day) → inspection plan and date → inspection → same-day flash report → full report within two working days → release, hold or re-inspection decision.

See the full inspection process

Industries

Who uses this inspection

  • Manufacturing and importers of engineered and consumer goods.
  • Retail and own-brand teams launching new lines.
  • Food and packaging where material identity matters.
  • Automotive and electrical component buyers.

FAQs

Initial Production Check (IPC) questions

Why TRAIBCERT

Faster response

A sector specialist replies to every inspection enquiry within one working day with a fixed man-day quotation. Inspections in TRAIBCERT's operating regions are booked within five working days at most locations.

Real-time information

Receive a flash report on the inspection day and the full report within two working days, with daily reports during production monitoring and expediting.

Inspectors who know the product

Inspectors are assigned by product category and discipline, including consumer goods, textiles, electrical, mechanical, welding and NDT, automotive and food. Competence records are kept for each inspector and method.

One body across the UK, the Middle East and India

Inspections use one report format, one point of contact and one quality system across TRAIBCERT's offices and inspector network.